Another 13 photovoltaic systems were successfully activated by SolarWay in October and November.
Specifically, the following systems were activated and put into production:
On 06/10/2011, a 9.90 kW photovoltaic system was activated on a roof in the area of Epia, Messinia.
On 11/10/2011, a 9.87 kW photovoltaic system was activated on a roof in Kalamata.
On 24/10/2011, a 9.87 kW photovoltaic system was activated on a roof in Kalamata.
On 10/24/2011, a 9.87 kW photovoltaic system was activated on a roof in the area of Eleochori, Messinia.
On 10/28/2011, a 9.90 kW photovoltaic system was activated on a roof in Tsoukalaika, Messinia.
On 29/10/2011, a 9.88 kW photovoltaic system was activated on a roof in Arfara, Messinia.
On 11/11/2011, a 9.88 kW photovoltaic system was activated on a roof in the area of Antheia, Messinia.
On 11/11/2011, a 9.88 kW photovoltaic system was activated on a roof in the area of Antheia, Messinia.
On 11/11/2011, a 9.90 kW photovoltaic system was activated on a roof in the area of Meligala, Messinia.
On 11/13/2011, a photovoltaic park with a power of 19.88 kW was activated in a stadium in the area of Kremmidia, Messinia.
On 11/13/2011, a 9.87 kW photovoltaic system was activated on a roof in Kalamata.
On 11/13/2011, a 9.87 kW photovoltaic system was activated on a roof in the area of Paleochora Avia.
On 15/11/2011, a photovoltaic system of 8.46 kW was activated on a roof in Kalamata.