Another 9 photovoltaic systems (8 in buildings and 1 in stadiums) were successfully activated by SolarWay in the first fortnight of July.

Specifically, the following systems were activated and put into production:

On 07/02/2011, a 9.90 kW photovoltaic system was activated on a roof in Arfara, Messinia

On 07/03/2011, a 9.88 kW photovoltaic system was activated on a roof in Riglia, Messinia

On 07/03/2011, a 9.88 kW photovoltaic system was activated on a roof in Riglia, Messinia

On 07/04/2011, a 9.88 kW photovoltaic system was activated on a roof in Mikri Mantineia

On 07/04/2011, a 9.88 kW photovoltaic system was activated on a roof in Kalamata, Messinia

On 05/07/2011 a photovoltaic park was activated with trackers of 19.8 kW power in a stadium in the area of ​​Hatzi, Messinia. The project was implemented in collaboration with HeliosRES

On 08/07/2011, a photovoltaic system of 9.87 kW power was activated on the roof & roof in Megalopolis, Arcadia.

On 13/07/2011, a 6.35 kW photovoltaic system was activated on a roof in Kalamata, Messinia.

On 15/07/2011, a 9.88 kW photovoltaic system was activated on a roof in Arfara, Messinia.

Μοιραστείτε αυτό το άρθρο