Plenty of solar net-metering system activations from SolarWay to 2022
Over 40 new net-metering solar self-generation projects activated in 2022 by the SolarWay team Specifically: On 3/01/22, a 6.75 kWp net-metering self-production photovoltaic system was activated, in the Paleovlassada area of Messinia On 3/01/22, a 1.8-kWp Net-metering...
Photovoltaic Net-Metering system with a power of 49.61 kW for Epikouros Biological Products
SolarWay installed on behalf of the company Epikouros Biological Products, a new photovoltaic energy compensation system with a power of 49.61 kW. The photovoltaic energy compensation system was placed on the roof of the premises of Epikouros Biological Products. The...
Solarway installs a virtual energy offsetting photovoltaic station at the 10th Primary School of Kalamata
A new flagship project is implemented by SolarWay. It concerns the installation of a photovoltaic plant with a power of 74.58 kW of virtual energy compensation at the 10th Primary School of Kalamata, on behalf of the Municipality of Kalamata. This project is expected...
New installation of self-consumption photovoltaic net metering 7.38 kW in a residence in Kalamata.
New installation of self-generated photovoltaic net metering 7.38 kW in a residence in Kalamata.The photovoltaic panels were placed on a roof. The photovoltaic system is expected to fully cover the electricity needs of the residence.The photovoltaic Net-metering...
Photovoltaic net metering in a hotel in Mani
Installation of solar panels in hotel in Mani.
New installation of photovoltaic self-consumption net metering 16 kW in a hotel unit.
12 Photovoltaic Systems were activated in the last four months by SolarWay
Another 12 photovoltaic systems have been successfully activated by SolarWay in the last four months.
Impressive video from the photovoltaic station implemented by SolarWay in Messinia
See with the help of a drone the 1 MW photovoltaic power plant than SolarWay – Energy Solutions implemented on behalf of the Energy Community of Kalamata Messinia, in the area of Chatzi, Messinia.
Implementation of a 10 kW photovoltaic system with batteries in a house in Messinia
The first in Messinia, and one of the first in Greece Net-Metering photovoltaic net metering system with parallel use of batteries, supplies clean electricity, an emblematic house in the area of Finikounda
1 MW photovoltaic power plant by SolarWay
SolarWay – Energy Solutions implemented on behalf of the Energy Community of Kalamata Messinia, a 1 MW photovoltaic power plant.
It is the first photovoltaic station connected in Messinia, after 8 years!
The licensing, supply, implementation, installation and connection to the HEDNO grid was done entirely by SolarWay. The photovoltaic station is located in the area of Hatzi, Messinia.
Implementation of a 46 kW photovoltaic system in a new office building in Maroussi that will house Google!
TERNA SA Trusting the quality of SolarWay photovoltaic projects, it commissioned the project for the supply and installation of a photovoltaic net metering system with a total power of 46 kW, in the new office building at Frangokklisias and Aigialeias streets in Maroussi, Attica.