Another 2 photovoltaic systems were successfully activated by SolarWay in December.
Specifically, the following systems were activated and put into production:
On 12/12/2011, a 9.87 kW photovoltaic system was activated on a roof in Stoupa, Messinia.
On 12/16/2011, a 9.87 kW photovoltaic system was activated on a roof in Kalamata.