12 Net Metering self-consumption photovoltaic systems successfully activated by SolarWay in the last half of 2021
Specifically, the following systems were activated and put into production:
- 6/4/2021: Photovoltaic Net Metering System was activated with 10 kWp batteries on the roof in Kamaria, Messinia.
- 17/4/2021: A 14 kWp Photovoltaic Net Metering System was activated on a roof in Chalandri, Attica.
- 1/6/2021: A 2.2 kWp Photovoltaic Net Metering System was activated on a roof in Kalamata, Messinia.
- 2/6/2021: Off Grid Photovoltaic System of 2 kWp power was activated on a roof in Prosilio, Messinia.
- 5/7/2021: OF Grid Photovoltaic System of 1 kWp power was activated on a roof in Kalamata, Messinia.
- 23/9/2021: A 10 kWp Photovoltaic Net-Metering System was activated on a roof in Kalamata, Messinia.
- 21/10/2021: Photovoltaic Net-Metering System power of 4.26 kWp was activated in a shelter in Agios Nikolaos, Messinia.
- 12/17/2021: Photovoltaic Net-Metering System was activated with 6.75 kWp batteries on a roof in Paleovlassada, Avlona, Messinia.
- 12/18/2021: Photovoltaic Net-Metering System power of 4.02 kWp was activated on a roof in Kamaria Evangelismos, Messinia.