Three other photovoltaic systems in buildings were successfully activated by SolarWay in the last week of February.

Specifically, the following systems were activated and put into production:

On 15/02/2011, a 9.87 kW photovoltaic system was activated on a roof in Velika, Messinia.
On 20/02/2011, a 9.5 kW photovoltaic system was activated on a roof in Plaka, Kalamata.
On 21/02/2011, a 9.87 kW photovoltaic system was activated on a roof in Velika, Messinia.

Μοιραστείτε αυτό το άρθρο