Another 4 photovoltaic systems were successfully activated by SolarWay in August and September.

Specifically, the following systems were activated and put into production:

On 01/08/2011, a photovoltaic system of 9.87 kW power was activated on a roof in the area of ​​Verga, Kalamata.
On 11/08/2011, a 9.88 kW photovoltaic system was activated on a roof in the area of ​​Abrochomatos, Kalamata.
On 08/09/2011, a 9.87 kW photovoltaic system was activated on a roof in Chandrinos, Messinia.
On 13/09/2011, a 9.87 kW photovoltaic system was activated on a roof in the area of ​​Vergas, Kalamata.

Μοιραστείτε αυτό το άρθρο