According to the latest data of PPC, until December 21, 2011 in the prefecture of Messinia, 300 Photovoltaic Systems of power up to 10 kWp have been activated in buildings.

Of these 300, SolarWay has activated 56 (19%).

The number of applications submitted under the Special Program for the Development of Photovoltaic (PV) Systems of power up to 10 kWp in buildings in the Prefecture of Messinia is estimated to exceed 700.

Regarding the larger than 10 kWp systems, 200 have been activated, which means that 500 photovoltaic systems of all categories are activated in the Prefecture of Messinia

Μοιραστείτε αυτό το άρθρο